Lab B
Each night Congo Online Retail needs to run a 3-step process:
Run a nightly batch Job closing out the business day for all of Congo Online Retail.
- Use the same
Timeout
command as the previous Lab.
- Use the same
Run a follow-up report for each of the major U.S. warehouses containing the individual warehouses’ production.
This is a Multi-Instance Job.
Use the same warehouse IDs and Paths as the previous Lab.
Run a Job that distributes each of these reports.
- Use the same
Timeout
command in the previous Lab.
- Use the same
Use either the genericp
program or the DOS Timeout
command for Jobs 1 and 3.
Use the same Embedded Script used in Lab 1A for the 2nd Job to pass Job Instance values for the warehouse ID and Path.
Enterprise Manager
Details
Each night Congo Online Retail needs to run a 3-step process:
Run a nightly batch Job closing out the business day for all of Congo Online Retail.
- Use the same
Timeout
command as the previous Lab.
- Use the same
Run a follow-up report for each of the major U.S. warehouses containing the individual warehouses’ production.
This is a Multi-Instance Job.
Use the same warehouse IDs and Paths as the previous Lab.
Run a Job that distributes each of these reports.
- Use the same
Timeout
command in the previous Lab.
- Use the same
Use either the genericp
program or the DOS Timeout
command for Jobs 1 and 3.
Use the same Embedded Script used in Lab 1A for the 2nd Job to pass Job Instance values for the warehouse ID and Path.